Dredging of shipping lanes, ponds, intake canals and other areas in the PLN Group coal power plant is carried out to maintain optimal depth. Some of the ongoing projects are PLTGU Muara Tawar, PLTA Musi, PLTA Besai, PLTU Nagan Raya.

The stages of the dredging work carried out include:

      1. Pre-eliminary survey

      2. Dredging design

      3. Pre-dredging survey

      4. Permit application

      5. Dredging execution

      6. Post-dredging survey