country country




icon
SERVICE OF
BAHTERA ADHIGUNA
Waterway Dredging

Dredging of shipping lanes, ponds, intake canals and other areas in the PLN Group coal power plant is carried out to maintain optimal depth. Some of the ongoing projects are PLTGU Muara Tawar, PLTA


Onshore Connection

Electricity usage from the supply of the PLN main distribution unit for BAg fleets that are docked at the coal power plant jetty owned by the PLN Group. This is done to reduce emissions and fuel


Backhaul Cargo (Freight Forwarding MTU & MDU)

Distribution of Material Transmisi Utama (MTU) and Material Distribusi Utama (MDU) to regional units of PT. PLN (Persero) which consists of 150 UP3 throughout Indonesia. BAg as shipment coordinat




More SERVICES
icon
SERVICES OF
COAL TRANSPORTATION & DREDGING MANAGEMENT

We currently own, manage and operate several ships and sea trains to transport commodities in Indonesia.

FLEETS OF

COAL TRANSPORTATION
ikon
BG BARUNA POWER 3301

Barge

330 ft

ikon
BG BARUNA POWER 3003

Barge

300 ft Jumbo

FLEETS OF

DREDGING MANAGEMENT